Municipal Theater in Swidnica
completion date:
2021 – 2022r.
A project has been developed for the Reconstruction of the Municipal Theater building in Swidnica
The auditorium and stage were redesigned, along with the interior design of the entire theater, and the elevation renovation was designed.
The building is on the list of objects, designated in the local plan for inclusion in the municipal register of monuments.
The front elevation was shaped in the 19th century (Rynek 43).
Designers:
arch. Anna Maląg
elevations arch. Anna Baran
Collaboration on Interior Design with arch. Pawel Klopotowski
Acoustics:
dr eng. Krzysztof Brawata
Theatre Technology:
MAAG with the project team