Olsztyn Puppet Theatre
completion date:
1990 – 1992 r.
The PZPR building was converted into a Puppet Theatre. During the adaptation work, a project for the interior and theatre technology was developed.
The stage has three playing plans with valves and stringing. The hall is designed for 120 spectators. The theatre space is not limited to the stage and auditorium. The entire theatre is designed for stage actions with the participation of children as well as fun and games. The interiors are connected by structures imitating wooden blocks.
Designer:
arch. Anna Maląg
Acoustics:
Ewa Więckowska Kosmala
Theatre Technology:
MAAG - Anna Maląg cooperation with OTO Tomasz Ostrowski and Zbigniew Kośka